Analyze the challenge and the scope of the assignment.
I estimated how much time I would be using on this assignment. I figured I would do the render when I leave, so I could use my time most efficient.
So this is how I planned my week. I found out I needed more time rendering then I originally thought. But I managed to use my time most efficient and had more than enough time this week.
How
I started with watching the DT videos and researched different HDR images. When I wast satisfied with that I started experimenting with different HDR images to see which ones would be best for my test. I did several test renders before I even started adding extra lights. When I added the lights I started working on the materials and the shaders to make them work the way I wanted to. By the time I was done with the lights I had long render times so I started working on the render settings. I managed to get the render time down to 1 min and 10 sec. But still, making 250 pictures would take time, so I desided to be satisfied with that result.
When I was satisfied with my test renders I started a batch render and went home.
And when I got to school the next day I shuffled trough my pictures to see how they were. I did some retakes on a few pictures but I didn't have to change anything, it was just something that the render had messed up. I put the pictures together in premiere. and made a video.